
Szatnia na medal 2026: planning the whole sports facility
The second 2026 Polish changing-room programme: closed application dates, project scope and practical coordination advice.
Read the guide →
Insights
Practical reading for developers, public bodies, schools, architects and contractors, focused on decisions that affect scope, cost and everyday use.
Safe Ground Journal
Practical decisions, programme updates and a well-prepared investment. Guides for businesses, institutions and local authorities.

The second 2026 Polish changing-room programme: closed application dates, project scope and practical coordination advice.
Read the guide →
The 3 April 2026 amendment to Poland’s Active Playgrounds programme: documentation, expenditure dates and practical project coordination.
Read the guide →
Planning a nursery playground: intended ages, active and quiet areas, supervision, surfacing and a clear designer brief.
Read the guide →
Compare EPDM, SBR and binder requirements, prepare a material enquiry and coordinate supply with the specified surfacing system.
Read the guide →
What to check in equipment sheets and surfacing documentation: free fall height, HIC and critical fall height.
Read the guide →
Choosing robinia equipment: play functions, exact variants, installation requirements, documentation and long-term care.
Read the guide →
A practical small-site playground brief: varied activities, equipment spaces, circulation and two coherent layout options.
Read the guide →
Planning shade, planting, rest areas and maintenance, informed by the 2026 summer weather context.
Read the guide →
Equipment identification, surfacing documentation, correction lists and operator handover: a practical project checklist.
Read the guide →
An autumn 2026 maintenance plan: surfacing, drainage observations, equipment records and carefully specified cleaning.
Read the guide →2026
Programme articles describe 2026 editions, not necessarily open calls. Check the organiser for the current status.
A practical playground investment plan covering the site, users, budget, equipment, surfaces and delivery preparation.
Read the guide →
Choosing a playground safety surface: fall height, base, drainage, EPDM, SBR, tiles and natural materials.
Read the guide →
Inclusive playground planning: access, surfaces, varied activities, rest and a legible zone layout.
Read the guide →
Planning a playground refurbishment: survey, scope, equipment, surfaces, phasing and completion records.
Read the guide →
Results of Poland's Active Playgrounds 2026 programme, funding levels and practical guidance for project preparation and delivery.
Read the guide →
Poland's Orlik 2026 construction programme: budget, funding levels, optional facilities and practical project preparation.
Read the guide →
The Orlik 2026 modernisation programme: funding, sports surfaces, equipment and preparation of a reliable facility survey.
Read the guide →
Poland's 2026 regional sports infrastructure programme: budget, funding level, eligible facilities and project preparation.
Read the guide →
The Active Orlik 2026 programme: activity funding, budget and guidance on inclusion, operation and facility maintenance.
Read the guide →
Managing playground safety through post-installation, routine, operational and annual inspections with clear facility records.
Read the guide →
Using Poland's local-government accessibility standards in playground access, surfaces, equipment and rest-area design.
Read the guide →
Key Polish technical requirements for playgrounds at multifamily housing: size, sunlight, distances, fencing and play functions.
Read the guide →
EU restrictions on polymeric infill for synthetic sports surfaces and what they mean for new long-term investments.
Read the guide →
Practical green criteria for playground and sports procurement: durability, service, repairability and life-cycle cost.
Read the guide →
Equipment, design and delivery, plus a coordinated supply of selected surfacing materials.